Once the concrete cured, timber framing installation began: load-bearing walls for two floors have been erected, and roof framing is underway. Exterior walls are sheathed with ZIP System structural panels, which provide both structural sheathing and a continuous water/air barrier that improves the home's energy efficiency. Next up: roofing, windows, MEP systems, and finishes.